Digesting

Schedule

Design

Future

Digesting projects

Lab tests

Pilot plant

Digesting f.a.q.

 
 
  Digester design

With a bloc scheme of a basic digester and the goals of a client a final design of the desired digester can be completed. In the design will be questionmarks that are to be solved.

Solving questionmarks is what PROCES-Groningen is doing.

In 1997 the PROCES digester KV01 was built. This was done by Andre Woltjer and it consisted of a 2,5 liter glass container. Andre managed to keep it alive for almost 2 weeks.

This was the challenge to build a digester that would last longer.